PRODUCT

Turn status and history into decision evidence.

Connect manufacturer data, equipment and component history, and assigned work in one product.

Shared product UI · demo dataDemo as of · · Asia/Seoul
02 / EQUIPMENT

AMR-031

Demo Site A · AMR · Demo AMR

Time zone · Asia/Seoul

Online
Manufacturer-reported stateNormal

Idle

Battery level · SOC44%

Manufacturer value

Observed / received05/10, 11:39 / 05/10, 11:39

Demo manufacturer state feed · Asia/Seoul

Equipment installed2024-10-05Since installation 24 months
As of 05/10/2026, 11:40Synthetic input

Installed components

  • BAT-031

    Battery · Demo battery

    Component installed05/04/2026, 09:00

    Since installation 6 months

    Installed
  • MOTOR-031-R2

    Motor · Demo drive motor

    Component installed05/08/2026, 09:00

    Since installation 2 months

    Installed

Previous components

  1. MOTOR-031-R1

    Motor · Demo drive motor · 05/10/2024, 09:00 → 05/08/2026, 09:00

    Installed period 22 months

    Previous component
Asset & components
Shared product UI · demo dataDemo as of · · Asia/Seoul

Distinguish the equipment installation date from the current component installation. Previous components retain their own history.

02 / EQUIPMENT

AMR-031

Demo Site A · AMR · Demo AMR

Time zone · Asia/Seoul

Online
Manufacturer-reported stateNormal

Idle

Battery level · SOC44%

Manufacturer value

Observed / received05/10, 11:39 / 05/10, 11:39

Demo manufacturer state feed · Asia/Seoul

Equipment installed2024-10-05Since installation 24 months
As of 05/10/2026, 11:40Synthetic input

Installed components

  • BAT-031

    Battery · Demo battery

    Component installed05/04/2026, 09:00

    Since installation 6 months

    Installed
  • MOTOR-031-R2

    Motor · Demo drive motor

    Component installed05/08/2026, 09:00

    Since installation 2 months

    Installed

Previous components

  1. MOTOR-031-R1

    Motor · Demo drive motor · 05/10/2024, 09:00 → 05/08/2026, 09:00

    Installed period 22 months

    Previous component
PRODUCT STRUCTURE

Collect, compare and act, with clear responsibilities.

Equipment data hub

Status and telemetry retain their source, observation time, units and quality. Component installation and replacement remain separate records.

Current functionality

Operational workflows

Record incident owners and deadlines, diagnosis reasons, manufacturer coordination and maintenance completion.

Current functionality

RONIQ comparative analysis

Compare the usual pattern in a 14-day observation window with the latest 24 hours. This differs from runtime or failure-probability prediction.

Statistical trial analysis

Condition-based prediction

A product design for runtime, failure risk and remaining life using operating conditions, component history and observed outcomes.

AI use example

Explore current analysis and prediction design →

Get started

Start with the robots you have.
A new way to operate.

Tell us about your robots, FMS and operating needs. Together, we check the environments that can connect.

Start an adoption consultation