Review evidence, then inspect
One asset. Four practical questions.
Explore AMR-031 operations, equipment and components. Battery observations and manual motor inspection records remain distinct.
See which equipment needs your attention today
Review the owner and deadline of a manually registered motor inspection, then follow the same asset.
What needs attention today
See the equipment, issue and next action together.
- Sites
- 1
- Equipment
- 1
- Online
- 1
- Open issues
- 1
- SLA at risk / breached
- 0
Review current status alongside component history
Distinguish the equipment installation date from the current component installation. Previous components retain their own history.
AMR-031
Demo Site A · AMR · Demo AMR
Time zone · Asia/Seoul
Idle
Manufacturer value
Demo manufacturer state feed · Asia/Seoul
Installed components
- BAT-031
Battery · Demo battery
Component installed05/04/2026, 09:00InstalledSince installation 6 months
- MOTOR-031-R2
Motor · Demo drive motor
Component installed05/08/2026, 09:00InstalledSince installation 2 months
Previous components
- MOTOR-031-R1Previous component
Motor · Demo drive motor · 05/10/2024, 09:00 → 05/08/2026, 09:00
Installed period 22 months
Judge unusual changes with the evidence in view
Trial analysis compares battery discharge patterns. It is separate from the motor inspection issue.
Changes from the usual pattern
AMR-031 · Analysis: RONIQ · Statistical trial analysis
Input data source: Demo manufacturer state feed
Time zone · Asia/Seoul
Observation window: 21/09, 10:00 → 05/10, 10:00 · Asia/Seoul
| Period | Median | Unit |
|---|---|---|
| Previous 13 days | 12 | %/h |
| Recent 24 hours | 24 | %/h |
Battery discharge rate data was compared. Other analysis metrics are insufficient. Operating-context information is also insufficient.
View analysis conditions
- Analysis type
- Operating condition analysis ·
HEALTH - Model version
trial-robust-hourly-v1- Value kind
- RONIQ analysis ·
DERIVED - Availability
- Evidence available ·
AVAILABLE - Input observation window
- 21/09/2026, 10:00 → 05/10/2026, 10:00 · Asia/Seoul
- Generated at
- 05/10/2026, 10:40 · Asia/Seoul
- Expires at
- 05/10/2026, 12:00 · Asia/Seoul
- Valid observation slot coverage
- 89.88%
- Trial observation score
- 0/100
- Trial confidence indicator
- 17.98%
Trial scores and confidence are not failure probability, battery SOH or validated accuracy.
- Statistical trial analysis ·
TRIAL_STATISTICAL_MODEL - Synthetic demonstration data ·
SYNTHETIC_INPUT - Some analysis metrics unavailable ·
PARTIAL_COMPONENT_COVERAGE - Operating context incomplete ·
WORKLOAD_CONTEXT_INCOMPLETE
- Battery discharge rate ·
battery.discharge_rate: 24 / 12 %/h
Review guidance: Review analysis evidence · REVIEW_EVIDENCE
Evidence for operator review; not failure probability, SOH or an automatic control result.
Keep action outcomes as evidence for the next decision
Read the cause, action and completion records for the manual motor inspection, separately from battery analysis.
From inspection to action
Drive assembly inspection after field report
Time zone · Asia/Seoul
Field operator acknowledged the inspection request.
A loose mount was found around MOTOR-031-R2; component failure was not confirmed.
Mount fasteners were adjusted. The motor was not replaced.
Field remeasurement note: vibration 1.9 → 1.4 mm/s; temperature 43 → 41 °C, recorded at the same 0.72 kW and ambient 28 °C conditions.
The field operator recorded the action as resolved.
Start with the robots you have.
A new way to operate.
Tell us about your robots, FMS and operating needs. Together, we check the environments that can connect.
Start an adoption consultation