From unusual changes to condition-aware prediction.
RONIQ adds comparative analysis to manufacturer readings, giving people more evidence for inspection decisions.
Changes from the usual pattern
AMR-031 · Analysis: RONIQ · Statistical trial analysis
Input data source: Demo manufacturer state feed
Time zone · Asia/Seoul
Observation window: 21/09, 10:00 → 05/10, 10:00 · Asia/Seoul
| Period | Median | Unit |
|---|---|---|
| Previous 13 days | 12 | %/h |
| Recent 24 hours | 24 | %/h |
Battery discharge rate data was compared. Other analysis metrics are insufficient. Operating-context information is also insufficient.
View analysis conditions
- Analysis type
- Operating condition analysis ·
HEALTH - Model version
trial-robust-hourly-v1- Value kind
- RONIQ analysis ·
DERIVED - Availability
- Evidence available ·
AVAILABLE - Input observation window
- 21/09/2026, 10:00 → 05/10/2026, 10:00 · Asia/Seoul
- Generated at
- 05/10/2026, 10:40 · Asia/Seoul
- Expires at
- 05/10/2026, 12:00 · Asia/Seoul
- Valid observation slot coverage
- 89.88%
- Trial observation score
- 0/100
- Trial confidence indicator
- 17.98%
Trial scores and confidence are not failure probability, battery SOH or validated accuracy.
- Statistical trial analysis ·
TRIAL_STATISTICAL_MODEL - Synthetic demonstration data ·
SYNTHETIC_INPUT - Some analysis metrics unavailable ·
PARTIAL_COMPONENT_COVERAGE - Operating context incomplete ·
WORKLOAD_CONTEXT_INCOMPLETE
- Battery discharge rate ·
battery.discharge_rate: 24 / 12 %/h
Review guidance: Review analysis evidence · REVIEW_EVIDENCE
Evidence for operator review; not failure probability, SOH or an automatic control result.
Trial analysis compares battery discharge patterns. It is separate from the motor inspection issue.
Start with the same asset's usual pattern.
Current trial analysis compares battery discharge rate, network latency and mission duration. The median of the preceding 13 days and the latest 24 hours provides the evidence of change within a 14-day window.
Analysis is withheld when coverage or quality is insufficient. A trial health score is not battery SOH, failure probability or validated accuracy.
A design that turns charge level into task headroom.
Manufacturer charge 48% · remaining task 90 minutes. A 100–140 minute load scenario supports reviewing the next task and charging.
The 90-minute task and 100–140 minute runtime scenario are different quantities.
Finishing the task does not validate runtime to complete discharge. This range is not a validated confidence interval.
Formula, adjustment assumptions and synthetic records
- Simple baseline
- 48% × 3.0 kWh ÷ 0.72 kW = 120 min
- Calculation assumptions
- Terminal SOC 0% · reserve 0 kWh · efficiency 1 · no temperature/load correction
- Synthetic task record
- 10:45–12:15 · 48% → 12% · 90 min
- Synthetic charging record
- 12:20–13:20 · 12% → 80%
Separate equipment age from component history.
Failure risk and remaining life require model evaluation using load, environment, component history and confirmed failure events.
MOTOR-031-R2 · Current installed component
Equipment service: 24 months / current motor: 2 months. Previous-component use is not added to the replacement component.
Condition comparison, operating exposure and model evaluation
The design example's 320h for the current component and 6,900h for the removed component are synthetic analysis material. They do not mean the current console collects cumulative operating counters.
The design compares vibration of 1.4→1.9 mm/s and temperature of 41→43°C under matched 0.72 kW load and 28°C ambient conditions. Motor vibration is not a metric supported by the current statistical analysis.
Distinguish normal exposure, observation ending, preventive replacement and failure events, then calibrate probabilities. Failure probability and remaining life are not calculated for this example.
From a maintenance record to an evaluable outcome.
Today, teams record diagnosis, actions and maintenance. Linking those results to prediction-time conditions to evaluate and improve analysis is a development direction.
Start with the robots you have.
A new way to operate.
Tell us about your robots, FMS and operating needs. Together, we check the environments that can connect.
Start an adoption consultation